2008
Greve, A.K, R.I. Acworth and B.F.J Kelly (2008). Design, Construction and Testing of 3D Borehole Resistivity Tomography Equipment to Measure Deep Drainage and Soil Moisture Changes. Report of UNSW CWI, March 2008.
Download.
Kelly, B., I. Acworth, B. Giambastiani, M. Andersen, A. Greve and A. McCallum (2008). 3D modelling. Australian Landcare Magazine Edition 320, March 2008.
View.
Timms, W. (2008). Uncertainty and groundwater yield. Irrigation Australia, Autumn Edition.
View.
Rau G., A. McCallum, M.S. Andersen and R.I. Acworth (2008). The Use of Natural Heat as a
Tracer to Quantify Surface Water and Groundwater Interactions: Maules Creek, New South Wales, Australia. University of New South Wales Connected Waters Initiative, March 2008.
Download.
2006
Timms, W. (2006). Desalination plant supply matched to coastal geological conditions. Engineers Australia, February: 46-47.
2004
Crawford, K and W Timms (2004). Implications of aquifer recharge for water sharing plans: a case study from the Upper Namoi valley. Irrigation Australia, pp21-27, April 2004.
Download.
Timms, W (2004). Operational savings of efficient groundwater bores. Irrigation Australia, p 45, August 2004.
Download.